Rate Schedule
Rates as of April 1, 2024 - 1st bill May 1st
Residential, Farm, Small Commercial, Public Authorities, Irrigation Pivot, Pow Wow, Seasonal & Metered Street Lighting Services
Facility Charge - $47.25 per month
All kWh per month @ .088
Demand Charge up to 25 KW @ $1.00 each
Demand Charge All excess KW @ $14.50 each
All separately metered electric heat - Heat credit @ .02 (October - April)
A service using over 50 KW or greater, served by 75 KVA or greater Transformer, Commercial Ev Charging Stations will be billed under the Small or Large power rate.
Street Lighting and Outdoor Lighting
175 watt mercury vapor | $11.00 per month |
400 watt mercury vapor | $17.00 per month |
Lucalox | $18.00 per month |
150/175 Metal Halide | $11.00 per month |
400W Metal Halide | $18.00 per month |
LED 70 W | $11.00 per month |
LED 100 W | $17.00 per month |
Metered Security Lights
100-175 watt mercury vapor/metal halide high pressure sodium | $5.00 |
400 watt mercury vapor/metal halide | $6.00 |
Irrigation Controlled Rate
Horsepower charge $25.00 per horsepower per season
$4.50 per KW per month
All kWh at $0.0565
Irrigation Non-Controlled Rate
Horsepower charge $25.00 per horsepower per season
$14.50 per KW per month
All KWH at $.0675
Small Power – 50.00 to 99.99 KW at any time within a 12-month period, EV Commercial Charging Stations or service requiring 75 KVA to less than 150 KVA transformer
Facility Charge - $80.00 per month
Demand Charge All KW x $14.50
All kWh per month @ .0575
Separately metered electric heat - Heat credit .02 per kWh (October - April)
Large Power Time of Day - 100.00 KW and over at any time wthin a 12-month period or a service requiring 150 KVA or greater transformer.
Facility Charge - $100.00
Demand Charge: All KW x $14.50
All kWh per month @ .060
All separately metered electric heat - Heat Credit .02 per kWh (October - April)
Time of Use Rate: Same as the Large or Small Power Rate Except the Demand Charge.
DEMAND CHARGE:
All KW will be billed @$4.50
On-Peak KW will be billed an additional $10.00 per KW (making the Peak Time of use rate $14.50 per KW)
On-Peak Times: June - September (3 pm - 7 pm) - October - May (7 am - 9 am), (6 pm - 10 pm)
FEES
Late Charge |
$12.50 |
Connection Fee |
$25.00 |
Deposit |
$200.00 |
Transfer Fee |
$15.00 |
Security Light Installation |
$75.00 |
Vandalized Security Light repair: | |
175 Watt |
$50.00 |
Meter Loop Fee |
$150.00 |
Staking Fee on new service (non-refundable) |
$150.00 |
Perfecting Fee on new service |
$150.00 |
Aid to construction on single phase overhead line build |
$5.00 per foot |
Aid to construction on single phase underground line build |
$5.00 per foot |
Aid to construction on three phase overhead line build |
$13.00 per foot |
Aid to construction on three phase underground line build |
$13.00 per foot |