Rate Schedule
Rates as of January 1st, 2019 - Current
Residential, Farm, Public Authorities & Seasonal
Facility Charge - $40.00 per month
First 800 kWh per month at .1125 (800 kWh equals $90.00)
Remaining kWh per month at .0825
All separately metered electric heat - Heat credit .02 (October - April)
A service using over 75 KW will be billed under the Large Power rate.
Small Commercial
Facility Charge - $45.00
First 800 kWh per month at .1125 (800 kWh equals $90.00)
Remaining kWh per month at .0825
All separately metered electric heat - Heat credit .02 (October - April)
A service using over 75 KW will be billed under the Large Power rate.
Street Lighting and Outdoor Lighting
175 watt mercury vapor | $11.00 per month |
400 watt mercury vapor | $17.00 per month |
Lucalox | $18.00 per month |
150/175 Metal Halide | $11.00 per month |
400W Metal Halide | $18.00 per month |
LED 70 W | $11.00 per month |
LED 100 W | $17.00 per month |
Metered Security Lights
100-175 watt mercury vapor/metal halide high pressure sodium | $5.00 |
400 watt mercury vapor/metal halide | $6.00 |
Irrigation Controlled Rate
Horsepower charge $25.00 per horsepower per season
$3.50 per KW per month
All KWH at $0.0565
Irrigation Non-Controlled Rate
Horsepower charge $25.00 per horsepower per season
$13.50 per KW per month
All KWH at $.0675
Irrigation Pivot Only
Service Minimum $480.00 per season ($40 per month)
All kWh at .0925
Small Power – 3 phase – 50 KW and under
Facility Charge - $60.00 per month
(KW – 25) x $13.50
(First 100 kWh x KW) x .1125
Remaining kWh per month at .0825
Separately metered electric heat - Heat credit .02 per kWh(October - April)
Large Power – 3 Phase – 50.01 KW and over
Facility Charge - $80.00
(KW – 10) x $13.50
(300 kWh x KW) x .0675
Remaining kWh per month at .0575
Separately metered electric heat - Heat Credit .02 per kWh (October - April)
FEES
Late Charge |
$12.50 |
Connection Fee |
$25.00 |
Deposit |
$200.00 |
Transfer Fee |
$15.00 |
Security Light Installation |
$75.00 |
Vandalized Security Light repair: | |
175 Watt |
$50.00 |
Meter Loop Fee |
$150.00 |
Staking Fee on new service (non-refundable) |
$150.00 |
Perfecting Fee on new service |
$150.00 |
Aid to construction on single phase overhead line build |
$5.00 per foot |
Aid to construction on single phase underground line build |
$5.00 per foot |
Aid to construction on three phase overhead line build |
$13.00 per foot |
Aid to construction on three phase underground line build |
$13.00 per foot |